Skip to main content

Tag: Solutions

People

Topsoe has made a number of changes to its board. Kim Saaby Hedegaard has been appointed as the company’s new Executive Vice President, Power-to-X. Hedegaard has served as interim Head of Power-to-X since May 2022. Before that, he held the position as Chief Operations Officer (COO). He joined Topsoe in 1999 and has since held various leadership positions within engineering, technology, and sales. Since 2017, he was responsible for Catalyst Production and Technology globally. He holds a MSc in chemical engineering from the Technical University of Denmark. He is replaced as COO by Andreas Bruun Jørgensen.

Road to sustainability

The energy transition has already commenced and while sulphuric acid production is already virtually carbon free, there will likely still be impacts on the sulphuric acid industry resulting from this energy transformation. Hannes Storch, Shailesh Chandrol, Collin Bartlett and Jens Kleiber of Metso Outotec present their view on a roadmap to sustainability, preparing for energy transition in the sulphuric acid industry through permanent product development, digitalisation and new technologies.

Commissioning amine plants in extreme environments

Operating plants in extreme environments can present unique challenges. If these challenges are not anticipated and addressed in design and commissioning, the plant will not be able to start up nor meet its specification. This article examines the challenges faced in commissioning amine plants operating in three diverse environments (extreme heat, extreme cold, and offshore) and the technical and procedural solutions employed to resolve them. Mike Sheilan, Ben Spooner, Kaiyr Tekebayev, and Philip le Grange , Amine Experts.

Syngas News Roundup

Maire Tecnimont subsidiary MyRechemical has been awarded a basic engineering contract for a waste to methanol and hydrogen plant to be located in Empoli, Tuscany. The scope of work includes the basic engineering design of the plant and the provision of necessary documentation to start the plant’s public authorisation process with the Tuscany region. The basic engineering phase is expected to be completed by the end of 2022. Once completed, the plant will process 256,000 t/a of non-recyclable waste and will produce 125,000 t/a of methanol and 1,400 t/a of hydrogen. The plant will use MyRechemical’s chemical conversion technology which allows the recovery of waste that cannot be mechanically recycled, or other types of unsortable dry waste. The carbon and hydrogen in the waste are converted via gasification into synthesis gas, which is used to produce low-carbon methanol and hydrogen.