
KBR awarded ammonia-urea project FEED contract
KBR been awarded a front-end engineering design (FEED) contract by Iraq's KAR Electrical Power Production Trading (KEPPT).
KBR been awarded a front-end engineering design (FEED) contract by Iraq's KAR Electrical Power Production Trading (KEPPT).
A model developed by ERCOSPLAN can help select the most efficient mining method for potash ore deposits.
The AFA's 37th International Technical Conference & Exhibition is being held at the prestigious UM6P in Benguerir City, Morocco.
Casale’s integrated revamp solutions for ammonia and urea plants are designed to unlock latent potential and boost operational performance.
Revamping existing urea plants can deliver significant improvements – including higher capacity, lower costs and reduced emissions.
TotalEnergies has awarded the China Petroleum Engineering & Construction Corporation (CPECC) the engineering, procurement, supply, construction and commissioning (EPSCC) contract to build its new Ar-Ratawi gas processing plant in Iraq. CPECC subsidiary China Petroleum Pipeline Engineering will build two midstream gas pipelines connecting the Majnoon and West Qurna 2 oilfields to Artawi-based processing plant. The planned gas pipeline infrastructure comprises a 114-kilometre sour gas pipeline built with 26-inch diameter pipes, an 83-kilometre, 20-inch sour gas pipeline, and an 83-kilometre, 20-inch sour gas pipeline. The awards form part of the TotalEnergies-led Gas Growth Integrated Project (GGIP) in Iraq, which is valued at $10 billion.
A round-up of current and proposed projects involving non-nitrogen synthesis gas derivatives, including methanol, synthetic/substitute natural gas (SNG) and gas- and coal to liquids (GTL/CTL) plants.
It is with great sadness that we report the death of Dr. Umberto Zardi, who passed away on March 17th 2025 at his home in Breganzona, Lugano, Switzerland. Dr Zardi was an innovator in the nitrogen industry and for many years the president and driving force behind Ammonia Casale, now simply Casale SA, becoming responsible for its revival and transformation into the global engineering and technology giant that it is today.
Revamps are performed to deliver production improvements at existing urea plants.
Gasgrid Finland Oy has awarded Worley a four-year framework agreement with an option for extension until 2032, to provide owners engineering services for Gasgrid’s hydrogen pipeline system development in Finland. This 1,100 km long hydrogen pipeline system is expected to link major hydrogen production and offtake centres across Finland and enable the development of hydrogen export routes to neighbouring markets. Gasgrid says that the planned hydrogen pipeline system will support cost-efficient, reliable and secure renewable energy market development for the Nordic countries and elsewhere in Europe. Worley will provide the OE services primarily through Worley’s offices in the Netherlands and Finland with support from the Global Integrated Delivery (GID) team in India.