Skip to main content

Nitrogen+Syngas 398 Nov-Dec 2025

Uhde completes hydrogen recovery unit


UNITED ARAB EMIRATES

Uhde completes hydrogen recovery unit

thyssenkrupp Uhde says that it has successfully commissioned a hydrogen recovery unit (HRU) at the Fertil ammonia-urea plant in Ruwais, owned by Fertiglobe, a global exporter of urea and ammonia. The scope of work included engineering, procurement and site supervision during installation and start-up of the units.

After the plant revamp and successful commissioning of the hydrogen recovery unit, the unit is now in operation. The plant will now have a revised capacity of 2,120 t/d of ammonia. The Hydrogen Recovery Unit (HRU) enables hydrogen recovery from the ammonia synthesis purge gas, allowing for increased feedstock utilisation and a 6% increase in ammonia output.ossible during ongoing plant operations.”

Latest in Agricultural

Grupa Azoty adds new sulphur fertilizer to its range

Grupa Azoty has launched DuoS® , a new nitrogen–sulphur fertilizer. Its formulation is based on ammonium sulphate, ammonium nitrate and anhydrite and includes two forms of nitrogen – nitrate and ammonium; two sulphur sources – ammonium sulphate and anhydrite; and calcium to support crop resilience and the quality of produce. The new nitrogen–sulphur fertilizer with added calcium is designed to improve nutrient use efficiency and reduce leaching and other nutrient losses. It is recommended for pre-sowing and top dressing on winter and spring cereals, winter rapeseed, sugar beet, potatoes, legumes, grassland, as well as vegetables and fruit crops. Grupa Azoty says it is introducing DuoS® in the current season as part of a strategy to develop its fertilizer business and focus on specialty products.

Canadian government underwrites phosphate feasibility study

First Phosphate Corp. says that it has finalised an agreement for a C$16.7 million non-repayable contribution from the Government of Canada via Natural Resources Canada’s Global Partnerships Initiative. The company says that the funding will accelerate the development of its phosphate project in Bégin-Lamarche by developing the technical and engineering parameters – including processing circuits and equipment – needed to validate the ability to produce a phosphate concentrate that meets the quality requirements of the lithium iron phosphate (LFP) battery market. The work will be conducted based on parameters established under the contract between First Phosphate and its definitive offtaker.