Skip to main content

Author: meninderkaurdavies

Ammonia plant upgrade and purge gas recovery

Cryogenic purge gas recovery units are very tolerant to increased flow from ammonia plant debottlenecking, especially the cryogenic cold box section. However, overload of the dehydration system upstream of the cold box can lead to fouling, loss of hydrogen recovery performance and the need for costly shutdown and thaw. Awareness of key plant parameters and some simple precautions can avoid such problems. A. J. Finn and T. R. Tomlinson of Costain provide some guidance.

People

EuroChem Group has announced the appointment of Samir Brikho as chairman of the company’s board of directors. Brikho has served on the board since 2018. He has also held senior management positions at Asea and ABB Power Generation between 1983 and 2000, before moving to Alstom, where he served as Chief International Operations Officer and Senior Vice-President, and CEO of Alstom Kraftwerke in Germany. In 2003, he became CEO of ABB Lummus Global and in 2005 he was appointed to the Group Executive Committee of ABB Ltd, and served as Head of the Power Systems Division at ABB Group. From 2006 to 2016 he was CEO of Amec Foster Wheeler. In 2009 and 2016 Brikho was chair of the World Economic Forum’s Engineering and Construction Board.