Skip to main content

Uncategorised

DTC / IPOS conference


You have been granted access to the recent editions of Sulphur and Nitrogen+Syngas magazines NovDec issues.

Please download here for Sulphur and here for Nitrogen+Syngas.

For 30 days access take out a Free Trial.

Latest in Uncategorised

Construction begins on large scale green methanol project

Construction has begun in northeastern China on a project that will produce 100,000 t/a of green methanol in its first phase from a combination of biomass and wind-powered green hydrogen. The project, part of the Shenyang Wind-Solar-Hydrogen Fusion Biomass Green Methanol Demonstration initiative, will be located in Kang-ping, Shenyang City. In its first phase, the facility will produce 100,000 t/a of green methanol, with construction expected to be completed within 24 months. The plant will gasify waste straw as its primary raw material, which will be processed into synthesis gas. This gas will then be combined with green hydrogen generated from 6.5 MW wind-powered electrolysers to produce low carbon methanol. The plant will also include a biomass pre-treatment facility capable of producing 337,000 t/a of biomass briquettes, providing a stable supply of feedstock.