Skip to main content

Edition Tag: Nitrogen Syngas 2025-03-31

New boilers enhance performance and reliability

A European ammonia plant, has successfully restarted following a revamp of the process gas cooling section, executed by Casale. Casale replaced the outdated boilers located downstream of the secondary reformer with three new double-tube type boilers supplied by Arvos. The new boilers were installed in the same location as the previous ones, minimising investment costs and plant modifications. The more robust and reliable design of the Casale-Arvos boilers has resulted in enhanced overall performance and reliability of the ammonia plant.

Hydrogen plant for Pengerang refinery

KT-Kinetics technology has signed an $125 million engineering, procurement, construction and commissioning (EPCC) contract to build a hydrogen production unit at Petronas’ Pengerang Biorefinery, Malaysia. The hydrogen plan is expected to be operational by the second half of 2028, and will supply up to 38,000 normal m3 /h of hydrogen for the production of sustainable aviation fuel (SAF) and hydrogenated vegetable oil (HVO). NextChem will license its NX ReformTM technology for the unit. The new biorefinery will process approximately 650,000 t/a of raw materials such as used vegetable oils, animal fats and waste from the processing of vegetable oils to produce sustainable aviation fuel (SAF), hydrotreated vegetable oil (HVO) and bio-naphtha.